“Our Dedication to your Project is as Flawlessly Concrete as the Relationships we Build.”

John Borges | OWNER

 
 
pexels-brett-sayles-1756957-Blue-1920w.jpg
 

Our Mission

To provide a highly specialized service that adds confidence and ability to our clients. We can do this by practicing professionalism, having unmatched concrete placement experience and expertise, and by deploying the latest and most accurate equipment on the planet.

 
 
 

“Creative Adaptability is What We’re All About”

JoHN Borges & JOHN LUI  |  Co-OWNERS

 
 
pexels-henry-&-co-2455074-1920w.jpg
 

Laser Screed Rental Rates

Somero S-22E Boom Screed

The S-22E offers 360° machine rotation, a 20' / 6 m boom reach, and a single-touch stabilizer control. The optional roller is positioned at the bottom of the plow, which allows the cream to rise to the top while pushing down larger aggregates and fiber. This allows the operator to seal the concrete in a single pass, especially useful when dealing with very low slumps,large aggregate, or fibers.

$ 0.11/SF
($2,300 Minimum)

With 3D Profiler
$ 0.14/SF + $175 Setup Fee/Day
($2,700 Minimum)

Somero S-22EZ BOOM Screed

Equipped with 360° machine rotation, a 20’/6m telescopic boom and your choice of pivoting screedheads, the S-22EZ continues the tradition of delivering the industry’s highest quality and production rates with unsurpassed maneuverability. The customized OASIS laser control system is simple to operate and is upgradeable as technology advances. A redesigned, EZ Clean Head reduces clean-up time and improves long term maintenance.

$ 0.11/SF
($2,300 Minimum)

With 3D Profiler
$ 0.14/SF + $175 Setup Fee/Day
($2,700 Minimum)


Somero S-840 LASER Screed

A fully automated self-leveling screed head, a raking head, and a sub-grade head. The automated screed process increases profitability by providing fewer man hours per project, and its custom control system provides faster elevation and SLS response. The S-840 can screed up to 5,000 square feet per hour on average.

$ 0.11/SF
($1,500 Minimum)

With 3D Profiler
$ 0.14/SF + $175 Setup Fee/Day
($2,000 Minimum)


$150/Hr Overtime Charge

$350 Per Mobilization + $3.00/mi travel*

JScreed, LLC assumes no liability for loss of profits, extra labor costs or consequential damages arising out of or resulting from material delivery or malfunction of the equipment. A slump of no less than 4” is required for proper screed placed concrete.

*Mobilization will incur an additional $3/mi traveled for travel beyond 70 miles from JScreed LLC, address listed.

 
 
 

Can we Meet your timeline?

Just Ask.

 
pexels-henry-co-1464474.jpg